©2024 Morley Builders, Inc. | Privacy
Morley Construction Company provided concrete services for this three-story, 56,000-square-foot structural steel frame energy center that supports the Kaiser Permanente San Diego Medical Center. The energy center contains a boiler room, chillers, emergency power, telephone equipment, water treatment and medical gas support, general power, a workshop, and a mezzanine level of office spaces. 30-foot-tall cast-in-place concrete walls envelop the perimeter of the main structure. These walls are supported with 15-foot-wide continuous wall footings; isolated footings support the interior steel columns. The elevated decks consist of normal weight concrete fill on metal deck.
Project Size:
56,000 gsf
Owner:
Kaiser Foundation Hospitals
General Contractor:
Hensel Phelps Construction Company
Architect:
CO Architects